Any blanks you can fill in below will expedite your quote, as well as reduce your change-order count:

028 (2)
  • Delivery required by what time
  • vessel is a:….. (test, group, wellsite, other) separator
  • Design Pressure
  • Operating pressure
  • Gas flow, MMSCF/d
  • HC flow, Bbl/d
  • Water flow, Bbl/d
  • Gas S.G.
  • HC S.G.
  • Water S.G.
  • Compositions available of above phases?
  • Orientation: vertical or horizontal
  • Service: sweet or sour
  • Vessel to be partially flanged or all-flanged?
  • Diameter required (ID or OD)
  • Shell length seam to seam
  • Inlet/Outlet size required
  • Design temperature Min/Max
  • Corrosion Allowance
  • Special material requirements (i.e. normalized, low or high temperature, impact tested)
  • NACE Compliance required Y/N?
  • Post Weld Heat Treatment
  • Special X-Ray requirements on vessel, or per Code
  • Impact testing
  • Std Mesh pad, or Vane pack required.
  • Registration requirements (i.e. province, country etc.)
  • Manway size preference
  • Packaging required?
    • Number of phases (2,3, or 4 for sand)
    • Special Weld Testing  required (i.e. % X-Ray on piping, or per code)
    • Insulation
    • liquid outlet(s) size req’d
    • skid required (are there shipping restrictions?)
    • Special color requirements
    • Special paint specifications
    • Internal coating required
    • Inlet header required ( How many wells, what size/ANSI rationg for the lines)
    • Building required?
      • shed or gable style
      • containment lip
      • floor drain, piped to skid edge
      • lift lugs
      • Pull bars
      • No. of doors
      • No. of windows
      • Heater req’d?
        • catalytic (AC or DC start)
        • Ruffnek or similar (Voltage)
  • Instrumentation related:
    • Pressure Controller
    • Shutdowns
      • High Level
      • Low Level
      • High/Lo Pressure
      • Emergency Shut Down
      • Gas meter required, and what size
        • Recorder, 2 pen or 3 pen
      • Liquid metering required, which phases?
        • Y-Strainer
        • Bypass
        • Proving taps
        • Totalizers
      • Sampling required
      • SCADA system option? System preference?
    • Fuel Gas scrubber or Instrument air from off-skid
    • Level Controllers, Fisher, Norriseal, Kimray,  Mallard, other
    • Liquid Control Valves, Fisher, Norriseal, Kimray, other
    • Level Gauge, brand preference
    • Valve(s), specification, make/model required
    • Chemical injection,
      • Tank, size, how many
      • Pump: Texteam, or other, how many
        • containment lip for pump
      • Level/rate gauge req’d.
    • Is a P.Eng. design review and approval required (i.e. P.Eng. stamp on drawings, if so which ones, P&ID, General Arrangement, Skid, BOM, Linelist, other?)
    • Other
Contact

Get in Touch!

Questions? Can’t find what you’re looking for or need a quote?


Call now to discuss your equipment needs.

403-215-3373

  • * Fields are required

  • This field is for validation purposes and should be left unchanged.