Any blanks you can fill in below will expedite your quote, as well as reduce your change-order count:
- Delivery required by what time
- vessel is a:….. (test, group, wellsite, other) separator
- Design Pressure
- Operating pressure
- Gas flow, MMSCF/d
- HC flow, Bbl/d
- Water flow, Bbl/d
- Gas S.G.
- HC S.G.
- Water S.G.
- Compositions available of above phases?
- Orientation: vertical or horizontal
- Service: sweet or sour
- Vessel to be partially flanged or all-flanged?
- Diameter required (ID or OD)
- Shell length seam to seam
- Inlet/Outlet size required
- Design temperature Min/Max
- Corrosion Allowance
- Special material requirements (i.e. normalized, low or high temperature, impact tested)
- NACE Compliance required Y/N?
- Post Weld Heat Treatment
- Special X-Ray requirements on vessel, or per Code
- Impact testing
- Std Mesh pad, or Vane pack required.
- Registration requirements (i.e. province, country etc.)
- Manway size preference
- Packaging required?
- Number of phases (2,3, or 4 for sand)
- Special Weld Testing required (i.e. % X-Ray on piping, or per code)
- Insulation
- liquid outlet(s) size req’d
- skid required (are there shipping restrictions?)
- Special color requirements
- Special paint specifications
- Internal coating required
- Inlet header required ( How many wells, what size/ANSI rationg for the lines)
- Building required?
- shed or gable style
- containment lip
- floor drain, piped to skid edge
- lift lugs
- Pull bars
- No. of doors
- No. of windows
- Heater req’d?
- catalytic (AC or DC start)
- Ruffnek or similar (Voltage)
- Instrumentation related:
- Pressure Controller
- Shutdowns
- High Level
- Low Level
- High/Lo Pressure
- Emergency Shut Down
- Gas meter required, and what size
- Recorder, 2 pen or 3 pen
- Liquid metering required, which phases?
- Y-Strainer
- Bypass
- Proving taps
- Totalizers
- Sampling required
- SCADA system option? System preference?
- Fuel Gas scrubber or Instrument air from off-skid
- Level Controllers, Fisher, Norriseal, Kimray, Mallard, other
- Liquid Control Valves, Fisher, Norriseal, Kimray, other
- Level Gauge, brand preference
- Valve(s), specification, make/model required
- Chemical injection,
- Tank, size, how many
- Pump: Texteam, or other, how many
- containment lip for pump
- Level/rate gauge req’d.
- Is a P.Eng. design review and approval required (i.e. P.Eng. stamp on drawings, if so which ones, P&ID, General Arrangement, Skid, BOM, Linelist, other?)
- Other